es

Vinton, Texas, USA

Wastewater Collection System for Vinton, Texas

The proposed project consists of the construction of a wastewater collection system in the Village of Vinton, Texas (the “Project”). The purpose of the Project is to reduce the human health risks associated with waterborne diseases and the potential for groundwater contamination related to exposure to untreated wastewater discharges, by providing first-time access to wastewater collection infrastructure for 506 homes. The new sewer system will collect and convey nearly 275,000 gallons per day of sewage to the John T Hickerson Wastewater Treatment Plant (WWTP), which is operated by El Paso Water (EPW). The Project includes the installation of household connections and the decommissioning of existing on-site systems.

Comments regarding the proposal must be received by November 10, 2019.

 

How To Comment

Comments regarding the proposal can be sent to the following addresses:

EMAIL
candidateprojects@nadb.org

FAX
U.S - (915) 975-8280
Mexico - 011 [52] 656-625-6999

MAIL

Mexico
Blvd. Tomás Fernández 8069
Cd. Juárez, Chihuahua, 32440

USA
P.O. Box 220718
El Paso, Texas 79913