Background

Given the significant lack of paving coverage in the city of Playas de Rosarito, the Project proposal utilize funds to increase paving coverage and continue to  achieve  of  reducing PM10 emissions. The  Project  achieved  the expected objectives of improved access to adequate road infrastructure and improved air quality by helping to reduce emissions by new paving roads in several residential areas of Playas de Rosarito that lacked this  infrastructure.  This  Project helped to meet paving deficiencies. The paving works helped local resident, directly, by improving their mobility in the city.

Description

The objective of the Project was to improve access to adequate road infrastructure, thus reducing harmful  emissions and contributing to an improvement in air quality and human health to provide; reduction of  harmful  emissions, access to paved roads, and Improvements to the water and wastewater system.

Benefits

The implemented Project consisted of first time road paving for an area of 700,000 m² in several residential areas, included; development of final designs, new paving, equipment acquisition, supervision and repair and Improvements to the water and wastewater system.

Project Financing

Total Project Cost US 21.17M
NADB Funding US 17.11M - NADB Loan

Project Photos

Results Measurement

Results are measured upon completion of the project through a closeout process that assesses project performance within 6-12 months after completion, as well as the achievement of the goals and objectives established at the time of project certification and financing approval.

Outcomes

Reduced emissions of PM10

Improvements to the water and wastewater system.

Indicators

Actual

Paved surface

744,117 m²

Estimate of PM10 emissions avoided

564 tons/year

Water hookups rehabilitated

1,767

Sewer connections rehabilitated

1,837

Outputs

 

Concrete paved surface

529,572 m²

Asphalt paved surface

214,545 m²

Water hookups rehabilitated

1,767

Sewer connections rehabilitated

1,837

Significant project contributions

Access to paved roads coverage (households)

 7,086