The project consists of the design, construction and operation of a 108-megawatt (MW) wind farm located in Tecate, Baja California, the second phase of a project certified by the NADB Board in November 2013. The electricity generated will be delivered to San Diego County through an existent transboundary 230-kV generator tie line and purchased by San Diego Gas & Electric (SDG&E), pursuant to a long-term Renewable Auction Mechanism Power Purchase Agreement (PPA).